Park Row Garage Repairs
PROJECT VOIDED SLAB ACHIEVEMENTS:
Matched existing slab elevation and headroom above and below the slab.
The concrete weight of the replacement slab met the design requirements.
This section of the existing garage needed replacement, and the new slab was required to be the same depth to match the existing head room above and below. The weight of the replacement slab needed to be of the same or less weight as the original. The original was constructed as a waffle slab which proved difficult to supply. Desimone Consulting Engineers designed the replacement as a voided slab using Cobiax USA CLS voids.
Additional resources on CobiaxUSA voided slabs can be found at www.cobiaxusa.com.
Project Team
OWNER:
Gotham Towers
ENGINEER:
Desimone Consulting Engineers
CONCRETE CONTRACTOR:
Mid State Construction