The REACH at JFK Performing Arts Center

JFK%252BPerforming%252BArts%252BCtr%252BImage%252B2.jpg

Blending SolutionsBy combining post-tensioning with voided concrete slabs the designers at Silman Engineers were able to minimize the structural depth, reduce the concrete volume and dead load. In addition, engineers were able to design the post-tensioning more efficiently.

PROJECT VOIDED SLAB ACHIEVEMENTS:

  • Enabled a flexible column layout

  • Load reduction: 37 psf in voided areas

  • Created large open spans with flat soffits

  • Combined voided slab and post-tensioned solutions

Unique spaces benefit once again from voided concrete slabs.

Project Team

ARCHITECT:      

  • Steven Holl Architects

ENGINEER:       

  • Silman Engineers

CONCRETE CONTRACTOR: 

  • Lane Construction