The REACH at JFK Performing Arts Center
Blending Solutions — By combining post-tensioning with voided concrete slabs the designers at Silman Engineers were able to minimize the structural depth, reduce the concrete volume and dead load. In addition, engineers were able to design the post-tensioning more efficiently.
PROJECT VOIDED SLAB ACHIEVEMENTS:
Enabled a flexible column layout
Load reduction: 37 psf in voided areas
Created large open spans with flat soffits
Combined voided slab and post-tensioned solutions
Unique spaces benefit once again from voided concrete slabs.
Project Team
ARCHITECT:
Steven Holl Architects
ENGINEER:
Silman Engineers
CONCRETE CONTRACTOR:
Lane Construction